BUILDER'S RISK INSURANCE: The Contractor, with sole liability for payment of premiums, shall purchase and maintain property insurance upon the Work at the site in the amount of the full replacement cost thereof. This insurance shall: • Include the interests of the Owner, Contractor, subcontractors, City Engineer, and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as a named insured; • Be written on a Builder’s Risk “all-risk” or open peril or special causes of loss policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, false work, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, flood, and damage caused by frost and freezing; • Include expenses incurred in the repair or replacement of any insured property (including, but not limited to, fees and charges of engineers and architects); • Cover materials and equipment stored at the site or at another location that was agreed to in writing by the Owner prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by the Owner or the City Engineer; • Allow for partial utilization of the Work by the Owner; • Include testing and startup; and • Be maintained in effect until final payment is made unless otherwise agreed to in writing by the Owner, Contractor, and City Engineer, with 30 days written notice to each other named insured to whom a certificate of insurance has been issued.
|
CARE OF WORK: The Contractor shall be responsible for all damages to persons or property that occur as a result of his fault or negligence in connection with the prosecution of the work and shall be responsible for the proper care and protection of all work performed until completion and final acceptance, whether or not the same has been covered in whole or in part by payments made by the City of Ocala. The Contractor shall avoid damaging sidewalks, streets, curbs, pavements, utilities, structures or any other property (except that which is to be replaced or removed) either on or adjacent to the site. He shall repair, at his own expense and in manner satisfactory to the City of Ocala, any damage thereto caused by his operations. All water and gas mains, all sewer and other pipes, and all conduits and other underground work of any nature, crossing or projecting into any trench or excavation and all appurtenances thereto, such as Cast Iron Valve Boxes, curb boxes, manhole casting, etc., shall be sufficiently and adequately shored and supported by timber and planking and protected by the Contractor from injury, and any damage or injury thereto shall be repaired by the Contractor at his own expense to the satisfaction of the Engineer.
|
OFFER AND ACCEPTANCE: The submitted bid/proposal is your contractual obligation in the absence of an actual contract when said offer is accepted by the City. The City reserves the right to request modification of the Bidder's offer to more fully meet the needs of the City, and any further offer is binding upon the Bidder. In case of default by the Bidder after acceptance by the City, the City may take action as it deems appropriate including legal action for damages or specific performance. Owner/Authorized Company Representative Initials:
|
ADA NEEDS: Please call the procurement professional shown on this listing forty-eight (48) hours in advance so arrangements can be made if reasonable accommodations are needed for you to participate in any meeting.
|
AWARDED CONTRACT FAILURE - BIDDING SUSPENSION I understand and agree to the following: Bidders who submit a bid to the City of Ocala and fail to fulfill the contract term, for any reason, will be subject to future bidding suspension for year (1), and up to a possible three (3) year bid debarment for serious contractual failures. Owner/Authorized Company Representative initials:
|
The City reserves the right to re-open bidding for a Best-and-Final offer.
|
CITY OF OCALA STANDARD SPECIFICATIONS FOR CONSTRUCTION (EFFECTIVE JANUARY 27, 2022): For this project, the Contractor will be bound by these specifications and conditions: STANDARD SPECIFICATIONS FOR CONSTRUCTION OF STREETS, STORMWATER, TRAFFIC, WATER AND SEWER INFRASTRUCTURE: https://bidocala.com/wp-content/uploads/City-of-Ocala-Standard-Specifications-for-Construction-1.27.22.pdf
|
BIDDER CONTRACTS: Bidder contracts/agreements will not be accepted in most cases. If a contract is required, only City of Ocala contracts will be used for all goods and services. The requirement of bidder contracts and/or bidder written terms and conditions may result in bid rejection. The City will consider adding appropriate bidder clauses into our contract; please upload any desired clauses with your solicitation response.
|
CONSTRUCTION SURVEY LAYOUT: The work to be performed shall be for the survey work necessary to establish proper alignments, right of way, easements, bench marks, elevations and grade stakes to complete all phases of this contract.
|
CLARIFICATIONS AND CORRECTIONS: The City of Ocala reserves the right, where it may serve the City’s best interest, to request additional information or clarifications from bidders/proposers, or to allow corrections of errors or omissions.
|
CONTRACT TIME: Contractor agrees, as a condition for submitting a bid, that the Work will be substantially completed within 60 day(s), and completed and ready for final payment in accordance with the Agreement within 10 day(s) after substantial completion. The Contractor agrees to commence work on the date specified in a written “Notice to Proceed” by the City for each project assigned. Such “Notice to Proceed” will be issued at the pre-construction conference, not to exceed 10 days from the preconstruction date. The Contractor must be able to mobilize and begin construction no later than 10 working days after notification, and complete the project by the time limit specified in the “Notice to Proceed.” At no time will the Contractor be allowed to lag behind.
|
CONTRACTOR’S EMPLOYEES: The foreman, employees, mechanics and other employed by the Contractor shall be skilled in the work given to them to do. Any employee of the Contractor who may use profane or abusive language to the Engineer or any Inspector, or otherwise impede or embarrass him in the performance of his duties, or who obstructs the progress of the work, shall upon the request of the Engineer, be immediately discharged and not again employed without consent of the Engineer. In doing any work contemplated by this contract, eight (8) hours shall constitute a legal day’s work by any laborer or workman employed by said Contractor hereon.
|
CONFLICT OF INTEREST: Disclose the name(s) of any employee, officer, director, shareholder, or agent of your firm that is also a City of Ocala employee or public official: Disclose the name(s) of any City of Ocala employee or public official that is a known relative of an employee, officer, director, shareholder, or agent of your firm: Failure to disclose known conflicts of interest may result in bid rejection and/or contract termination, if awarded. City of Ocala employees who have a 5% or more interest in a bidder's firm must also complete an "Officer and Employee Disclosure Statement" which can be obtained at www.bidocala.com under Vendor Resources. This form includes instructions and relative Florida statutes. Failure to complete this form, if applicable, may result in bid rejection.
|
LIQUIDATED DAMAGES: The Contractor shall pay the City $ 250 for each calendar day that expires after the time specified for Substantial Completion, until the Work is substantially completed. After Substantial Completion, if the Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times or any proper extension thereof granted by the City, the Contractor shall pay an additional $ 50 per day for each calendar day that expires after the time specified until Final Completion and acceptance of the project by the City. The liquidated damages set forth herein shall not be accumulative. If Substantial Completion of the Work is not met within the time specified for final completion of all Work, the liquidated damages shall continue to be at the rate or rates specified for default on Substantial Completion until Substantial Completion is attained. If the Work is not then finally completed, the rate or rates specified for default on final completion shall apply until final completion is attained. The City shall have the right to deduct the liquidated damages from any money in its hands, otherwise due, or to become due, to the Contractor, or to initiate applicable dispute resolution procedures and to recover liquidated damages for non-performance of this Contract within the time stipulated. Nothing in this section is intended to limit the right to obtain injunctive relief or any and all relief as may be appropriate. Permission allowing the Contractor to continue and finish any part of the work after the time fixed for its completion or after the date to which the time for completion may have been extended shall in no way operate as a waiver on the part of the City of any of its rights under this Agreement.
|
MANUFACTURER SERVICES: The Contractor shall furnish manufacturer’s representative as required to resolve assembly or installation problems with their products and systems. The Contractor shall conduct, with the assistance of the manufacturer/supplier’s representative, start-up and operational tests on the equipment and system.
|
OWNER: The Project has been designed for the City of Ocala ("Owner"), who may also be referred to in the Bid Documents as Project Manager, or the Engineer. All work and material furnished under this contract shall be furnished under the direction of, and to the satisfaction and approval of the Owner. Should any dispute arise as to the quality or fitness of the materials or workmanship, the decision shall rest strictly with the Owner, and shall be based upon the stated requirements in the Bid and Contractor’s Bid response. This power and authority shall not extend to the actual execution of the work which shall be under the control of the Contractor, and for which the Contractor alone is responsible. The Contractor warrants all materials, equipment, or supplies furnished and all work performed under this contract will be new, of specified quality, free from faults and defects, free from faulty design, and of sufficient size and capacity and of proper materials to meet in all respects the requirements of the contract. The Contractor shall obtain for the benefit of the Owner all standard warranties of subcontractors, suppliers, and manufactures of all material, equipment or supplies manufactured, furnished or installed.
|
LOCAL VENDOR PREFERENCE: Preference in solicitations: * Applies to bids in excess of $50,000. * Local vendor within 5% of low bid has the option to contract for 1% less than the low bid amount. * Any tie between local vendors will be settled with a best and final offer (BAFO) from each local vendor. * GRANT FUNDED PROJECTS DO NOT ALLOW LOCAL PREFERENCE. http://www.bidocala.com/vendor-resources/ Details of the Local Vendor Preference are available at: Every Bidder MUST select "Yes" or "No." YES, I am a local vendor. (If you selected Yes, you must also confirm the requirements below to receive local preference) NO, I am not a local vendor. If you desire to receive local preference for this solicitation, you must confirm your business meets the following requirements: 1. Has its headquarters, manufacturing facility, home office, locally-owned franchise, or an operating branch physically located within Marion County, Florida; 2. Has been in operation in Marion County for a minimum of one year prior to the issuance of the city’s formal bid solicitation; and 3. Before the issuance of the city’s formal bid solicitation has paid commercial real property tax, paid/filed a tangible personal property tax form with Marion County; has received a City of Ocala Home Occupation Permit, or has received a City of Ocala business tax certificate. Vendor will be required to submit a Local Vendor Preference Affidavit immediately upon notification from Procurement if the local preference will affect the outcome of this solicitation. Local Vendor will be required to agree to a contract with the City in an amount 1% less than the low bid amount within two (2) business days of notification from City. Owner/Authorized Company Representative initials:
|
MAJOR MATERIAL SUPPLIERS: SUPPLIER #1 Company Name: Material: City, State: SUPPLIER #2 Company Name: Material: City, State:
|
PERFORMANCE EVALUATION: At the end of the service period, the City may evaluate vendor performance. This evaluation will become public record.
|
RETAINAGE WITHHELD: No partial payment shall bind the Owner to the acceptance of any materials or work in place as to quality or quantity. All partial payments are subject to correction at the time of final payment as provided in the section titled Acceptance and Final Payment. The amount of retainage withheld from the Contractor's monthly partial payments shall be five percent (5%).
|
FLORIDA STATUTE 287.133: Public Entity Crime; denial or revocation of the right to transact business with public entities. Vendor on its behalf and its affiliates agrees and affirms that it has not been placed on the convicted vendor list following a conviction of a public entity crime as provided for in Section 287.133(2)(a), Florida Statutes, which states: a person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases or real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO, for a period of 36 months from the date of being placed on the convicted vendor list. Owner/Authorized Company Representative initials:
|
REFERENCES: References within the previous three years are preferred. REFERENCE #1 Company Name: Contact Person: Phone Number: Email Address: Date of Service:
 | Loading… |
|
27 | 29 | 30 | 1 | 2 | 3 | 4 | 5 |
28 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
29 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |
30 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |
31 | 27 | 28 | 29 | 30 | 31 | 1 | 2 |
32 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
to
 | Loading… |
|
27 | 29 | 30 | 1 | 2 | 3 | 4 | 5 |
28 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
29 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |
30 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |
31 | 27 | 28 | 29 | 30 | 31 | 1 | 2 |
32 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
Contract Value: Contract Details and/or Description:
|
REFERENCE #2 Company Name: Contact Person: Phone Number: Email Address: Date of Service:
 | Loading… |
|
27 | 29 | 30 | 1 | 2 | 3 | 4 | 5 |
28 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
29 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |
30 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |
31 | 27 | 28 | 29 | 30 | 31 | 1 | 2 |
32 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
to
 | Loading… |
|
27 | 29 | 30 | 1 | 2 | 3 | 4 | 5 |
28 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
29 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |
30 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |
31 | 27 | 28 | 29 | 30 | 31 | 1 | 2 |
32 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|
|
Jan | Feb | Mar | Apr |
May | Jun | Jul | Aug |
Sep | Oct | Nov | Dec |
Contract Value: Contract Details and/or Description:
|
TIMELY PAYMENT FOR PURCHASES OF CONSTRUCTION SERVICES: Payments shall be made no later than the time periods established by Section 218.735, Florida Statutes.
Prime contractors shall pay subcontractors for satisfactory performance of their contracts no later than 30 days from receipt of each payment the City of Ocala makes to the prime contractor, or as specified in the current F.S. 218.735, whichever time frame is earlier.
|
REQUESTED AND ADDITIONAL DOCUMENTS Upload any requested and additional documents here:
Max. File Size you can upload is: 50MB. *.exe files will not be accepted
|
REQUIRED LICENSES AND CERTIFICATIONS: My firm and/or sub-contractors can comply with the license and certification requirements in the scope and/or this listing. Vendor shall upload all licenses and/or certifications with their response and must submit required licenses and certifications immediately upon request from the City. Owner/Authorized Company Representative initials:
|
SAFETY AND ENVIRONMENTAL: Vendor will be responsible at all times for precautions to achieve the protection of all persons including employees and property throughout the resulting contract term. The Vendor shall make an effort to detect hazardous conditions and shall take prompt action where necessary to avoid accident, injury or property damage. EPA, DEP, OSHA, and all other applicable safety laws and ordinances shall be followed as well as American National Standards Institute Safety Standards. All hazardous spills, accidents, injuries or claims or potential claims shall be reported promptly to the City Risk Management Department at 352-401-3989, or cell 352-572-0414, and rdennis@ocalafl.org. Agrees to comply with the safety and environmental requirements above. Owner/Authorized Company Representative initials:
|
SOLICITATION DOCUMENTS: The City of Ocala (City) has no responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the official City links below: Bid Ocala: www.bidocala.com ProRFx Florida: www.florida.prorfx.com Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued.
|
SUBCONTRACTORS AND DBE GOALS: The bidder represents the subcontractors listed below are financially responsible and are qualified, insured, licensed, and certified to do the work required. The bidder will endeavor to use DBE/MBE subcontractors whenever possible. For non-grant funded projects, City of Ocala's goal is 15% as a race-neutral DBE goal. FDOT funded projects have an overall DBE goal of 10.65%. The Ocala International Airport's DBE goal is 12%. SunTran's goal is 10.65%. DBE firms can be located via this directory: Florida Department of Transportation DBE Directory No subcontractors will be utilized. Our company will be utilizing more than two (2) subcontractors. Our list of subcontractors including percent of work is attached in the section labeled "REQUESTED AND ADDITIONAL DOCUMENTS." A fillable subcontractor list is available at: subcontractor list Bidder/Prime must perform a minimum of 30% of the work with their own forces unless specified differently in the Scope of Work. NOTE: Bidder/Prime not providing an accurate, good faith estimate of subcontractor percent (%) of work may have their bid rejected.
|
SUBCONTRACTOR #1
|
Company Name: Work Category: City, State: DBE MBE
|
Percent of Work: %
|
SUBCONTRACTOR #2
|
Company Name: Work Category: City, State: DBE MBE
|
Percent of Work: %
|
WARRANTY ON LABOR AND MATERIALS: Warranty on Labor: Calendar Days Warranty on Materials: Calendar Days
|